    ICRA Certified Contractor

    Infection Control Risk Assessment. The highest standard of safety for Cincinnati's healthcare renovations and clinical buildouts.

    Patient Health Precedes Construction

    When working inside an occupied hospital, ambulatory surgery center, or medical clinic, standard construction practices put lives at risk. An ICRA certified contractor employs specialized engineering controls to absolutely prevent the migration of airborne particulate matter.

    • Rigid Containment: Using advanced hard-wall barriers and pressurized containment zoning.
    • Negative Air Pressure: Installing and monitoring massive HEPA air scrubbers to guarantee dust is filtered and safely exhausted from the sterile environment.
    • Anteroom Protocols: We construct enclosed sticky-mat vestibules to vacuum and de-suit workers before they re-enter public medical corridors.

    HVAC Isolation

    Critical ceiling space management to seal off hospital returns from drawing in lethal construction pathogens.

    Joint Commission Ready

    Daily site checklists and documentation logging precisely align with state regulatory and Joint Commission audits.

    All ICRA Classes Covered

    From routine maintenance (Class I) inside active corridors to high-risk structural demolition (Class IV) near immunocompromised oncology wings.

    Proof

    Proven on a live ICRA project

    For UC Health, RCG delivered a dual-suite physicians' office buildout inside an occupied medical facility — selective demolition, MEP rough-in, and active infection-control containment — with both suites turned over turnkey, on schedule.

    See the UC West Chester ICRA case study →
    More proof

    More healthcare work on working campuses

    At UC Health's Midtown campus, RCG rebuilt a Facial Plastics procedure suite room by room inside a working medical office building, with the building's daily operations undisturbed. In West Chester, RCG re-planned a UC Health physician practice suite in place while the practice on the other side of the building stayed open.

    What Your ICRA Plan Covers Before Work Starts

    An ICRA plan is written for one project, not pulled from a binder. Before the first barrier goes up, ours sets out:

    • Risk assessment. The type of construction activity weighed against the patient population in the adjacent areas. That sets the class of precautions, I through IV.
    • Containment. Where rigid barriers, anterooms and negative air machines go, and the route workers and debris take in and out.
    • HVAC isolation. Which returns and supplies are sealed so construction dust cannot enter the facility's ventilation.
    • Monitoring and documentation. Particulate monitoring and daily inspection logs that your infection-control team and Joint Commission surveyors can review.

    How the four classes differ is laid out on our Healthcare Renovations page and in the ICRA Contractor Guide.

    Four Questions to Ask Any ICRA Contractor

    Ask us these first, then ask everyone else on your bid list:

    1. Are your on-site superintendents individually ICRA certified? A company-level claim is not enough. The person running your job every day has to hold the certification.
    2. Can you show me the containment plan for this specific project? It should exist in writing before the first day of work.
    3. What particulate monitoring equipment do you use? The answer should be a particle counter, not a guess.
    4. Do you also hold OSHA 30? ICRA covers infection control. OSHA 30 covers construction safety. You want both.

    ICRA Construction FAQs

    ICRA (Infection Control Risk Assessment) certification trains construction professionals on how to safely build, renovate, and maintain environments within occupied healthcare facilities. The goal is to prevent the release of dangerous airborne pathogens and dust that could compromise patient health.

    Hospitals house immunocompromised patients. Construction dust often carries Aspergillus, a deadly mold spore. Joint Commission standards and facility regulations mandate that any invasive hospital construction must utilize advanced negative air containment protocols managed by correctly certified teams.

    For high-risk Class IV work, our ICRA-certified superintendents isolate the HVAC system, construct rigid impermeable barriers, establish anterooms, implement HEPA air scrubbing outfitting, and conduct continuous particulate monitoring before a single demolition tool is swung.

    Yes. Every RCG superintendent and foreperson managing healthcare projects is formally ICRA certified, and the company holds OSHA 30-hour construction safety certification.

    The class of precautions depends on the construction activity and on who is in the adjacent spaces, not on the building type. A small job in an outpatient suite may only need Class I or II measures, while demolition next to vulnerable patients calls for Class III or IV. The risk assessment at the start of the project decides, and we document it in the ICRA plan.